Get your Cooling Water Savings Roadmap.
A consulting-grade plan, built for your facility
Your true water consumption, mapped
How many gallons your site is actually using, and how that compares to a properly optimized program.
Dollar-for-dollar savings potential
What switching approaches would save you in water, sewer, and energy, with a clear payback timeline.
Hidden risk, surfaced
How well your current program is controlling scale, corrosion, and bacteria, and recommendations to protect your equipment.
An efficiency gameplan
Where your system is using more water, energy, and chemical than needed, and how to lower that consumption.
A $2,500 engineering assessment, yours free and delivered within one week.
From the Facilities We Serve
"We've been saving roughly 10 million gallons and $180K in cost a year."
“Capture H₂O is super helpful and always willing to work and support my team and me proof of their high engagement and professionalism. They are a great resource for data and are very receptive and understanding to my feedback and needs. The operations team is great at responding to my needs for estimates, invoices and timely updates. I’m super appreciative to have a great team assisting me in driving my water treatment process effectively. Thank you all!”
Oscar, Facilities/Engineering
Lincoln Property Company
Unire Group
Paragon Services
Irvine Company
What the Average Capture H2O Site Saves in a Year
All shortfalls of projected cost savings will be credited back to the customer annually.
How it Works
Send us your site data
- About 5 minutes · We never share or sell your info
Our engineering team builds your Roadmap
- Done internally by our engineering team
You receive your Roadmap
- Delivered to you within one week
Built for facilities with real cooling load and water to save.
- 200+ tons of cooling capacity
- $25K+ annual water and sewer spend at one or more sites
- A multi-site portfolio considering a single water treatment partner
Frequently Asked Questions
About a week from the time we receive your data. We don’t outsource it and we don’t templatize it.
No. The Roadmap is yours to keep. There’s no obligation to move forward, no auto-enrollment in anything, and no high-pressure sales process. If the numbers make sense, we’ll talk about next steps. If they don’t, we’ll tell you that too.
Three required fields take less than five minutes: site address, total cooling tonnage capacity, and current cycles of concentration. A handful of optional questions (water bills, current chemical program, system age, sustainability targets) sharpen the analysis, provide what you have.
Not necessarily. The Roadmap is a diagnostic, not a sales pitch. Some sites use it to benchmark their existing program. Others use it as the business case to switch. Either is fine.